WEEK 03 - CRIT 02






REFLECTIONS/COMMENTS


    To have bigger voids inside the space, relocating the spiral staircase because of the beam. Having glass walls for the cafe area.


    Adding openings from the depository to the main area of the ground floor. Changing the furniture layout in the depository room. 


    Adding a glass structure in front of the existing facade is to show how lights come in through the camera through different types of lenses. Having a void area in the front part of the shop lots so natural lighting can pass through all the floors. For the rotating rack, add more void space for artificial lightings to penetrate through it. Dividing the space into 3 parts which are public/light, semi-public/semi-light, and private/dark.


PROGRESSION WORK (MIRO)

Comments

Popular posts from this blog

WEEK 08

WEEK 01 - CRIT 01